All of our installations are carried out by Andersen EV employees (Mainland UK)
What is included in my installation?
The table below provides details of what is included in a standard installation.
Bespoke Installation designs are accurately priced after your survey is completed.
You will only need to pay for any additional materials and labour over and above our standard installation specification.
Andersen A2 |
Standard Installation |
Cable | |
---|---|
Up to 15m Cable Run | |
Clear Cable Route* | |
Running Cable Underground** | |
Installation | |
Connecting to your electricity supply | |
Full Electrical Certification IAW Electrical Regulations BS7671 | |
Installing on a suitable Surface | |
Drill through more than 1 wall | |
Lifting Carpets & Floorboards*** | |
Installation above 1.8m | |
Up to 4 hours on site | |
Adaptive Fuse **** | |
Solar package **** | |
Up to 7m of Plastic Trunking to conceal interior Wiring | |
Pulling Cable through pre-installed ducting | |
2 Installer Installation ***** | |
App Set-Up and Demo | |
Power | |
Andersen A2 22kw Install | |
Installation of Type A RCD Protection | |
Installation of 40A Overcurrent Protection | |
* Andersen EV will not remove or take apart furniture; we require a clear cable route on arrival.
** We do not excavate or carry out groundworks. If this is needed a ducting pipe needs to be installed with draw wires. More information can be provided.
*** Andersen EV - will assist with removing floorboards and carpet but are not responsible for any damage.
**** The adaptive fuse and solar package are not compatible with our 22kW (3-phase) charge point.
***** Health & Safety stipulation, eg – working at heights or confined spaces, complicated and commercial installs, etc. will require 2 engineers working together. This will be discussed in detail with the customer.